|
|
Status rigth nowThe next technical step in this projekt that will take place is a test in a real sea condition. A ideal place where the wave conditions fit this 1:40 scale model has already been picked out. Rigth now a special turbine that has been devoloped for this WEC is beeing build. This turbine is also beeing build i a 1:40 scale so that it fits this WEC. In the test in the real sea conditions the efficiency of the WEC will be meassured by comparing the energy in waves, with the rotation energy from the special turbine.
|
|